| 
                                             CV Information 
                                             | |
|---|---|
| 
                                               
                                                                                                    Grant's Name,"Project's Title" (Research Period)(Role)[Sponsorship]
                                                                                             
                                         | |
| 1 | EXTERNAL AGENCY (INDUSTRY - DTD), "AI DRIVEN NATURAL LANGUAGE TO SQL ENGINE FOR MANUFACTURING ANALYTICS USING OPEN SOURCE LLMS" (01.08.2025 - 31.07.2026) (Principal) [ VISIONLYTICS SDN. BHD. ] - Source: eR&I  | 
                                        
| 2 | EXTERNAL AGENCY (INDUSTRY - DTD), "AREA OPTIMIZATION OF HIGH VOLTAGE INJECTION - LOCKED OSCILLATOR LAYOUT DESIGN" (01.01.2024 - 31.05.2024) (Principal) [ INFINEON TECHNOLOGIES ( PENANG ) SDN BHD ] - Source: eR&I  | 
                                        
| 3 | EXTERNAL AGENCY (INDUSTRY/PRIVATE), "HIGH-SPEED FREQUENCY LOCK DETECTOR WITH MASTER - SLAVE D FLIP -FLOP DESIGN" (01.11.2023 - 31.07.2024) (Principal) [ OPPSTAR TECHNOLOGY SDN BHD ] - Source: eR&I  | 
                                        
| 4 | EXTERNAL AGENCY (INDUSTRY/PRIVATE), "BLOCK-LEVEL VERIFICATION OF BLOCK RANDOM ACCESS MEMORY (BRAM) IN FPGA" (01.11.2023 - 31.07.2024) (Principal) [ OPPSTAR TECHNOLOGY SDN BHD ] - Source: eR&I  | 
                                        
| 5 | EXTERNAL AGENCY (INDUSTRY/PRIVATE), "GOOD FLOOR PLANNING AND LAYOUT TO ACHIEVE STABILITY OF HIGH POWER VOLTAGE REGULATOR IN PLL USING LDO LAYOUT" (01.11.2022 - 30.09.2023) (Principal) [ OPPSTAR TECHNOLOGY SDN BHD ] - Source: eR&I  |