CV Information
MOHD ZULKIFLY BIN ABDULLAH PROFESOR IR. DR. MOHD ZULKIFLY BIN ABDULLAH
Grant's Name,"Project's Title" (Research Period)(Role)[Sponsorship]
1 EXTERNAL GRANT INDUSTRY (BJIM), "EXPERIMENTAL AND COMPUTER SIMULATION ON WAFER-LEVEL WARPAGE FOR DIFFERENT REFLOW THERMAL PROFILES, WAFER SIZES AND SHAPES" (15.07.2024 - 14.07.2026) (Principal)
[ INTEL ELECTRONICS (MALAYSIA) SDN. BHD. ] - Source: eR&I
2 FUNDAMENTAL RESEARCH GRANT SCHEME (FRGS), "POROUS MEDIA COMBUSTION OF ULTRA-LOW VEGETABLE OIL DROPLETS: MECHANISTIC AND PROCESS STUDY" (01.01.2019 - 31.12.2021) (Principal)
[ KEMENTERIAN PENDIDIKAN MALAYSIA ] - Source: eR&I
3 EXTERNAL AGENCY (INDUSTRY/PRIVATE), "P04C2-13 FSI ANALYSIS OF THE EFFECT OF DIE THICKNESS AND ASPECT RATIO OF STACKED CHIP IN ENCAPSULATION PROCESS OF MOULDED UNDERFILL PACKAGING" (01.04.2014 - 31.03.2016) (Principal)
[ COLLABORATIVE RESEARCH IN ENGINEERING, SCIENCE AND TECHNOLOGY CENTER (CREST) ] - Source: eR&I
4 FUNDAMENTAL RESEARCH GRANT SCHEME (FRGS), "A STUDY ON THERMO PHOTOVOLTAIC (TPV) GENERATION OF ELECTRICITY IN A WASTE COOKING OIL-FIRED POROUS BURNER." (01.06.2012 - 31.05.2014) (Principal)
[ KEMENTERIAN PENGAJIAN TINGGI ] - Source: eR&I
5 PROTOTYPE RESEARCH GRANT SCHEME (PRGS), "PROTOTYPE DEVELOPMENT OF POROUS MEDIUM BURNER FOR HOUSEHOLD APPLICATIONS" (01.11.2011 - 31.10.2013) (Principal)
[ KEMENTERIAN PENGAJIAN TINGGI ] - Source: eR&I
6 EXTERNAL AGENCY (INDUSTRY/PRIVATE), "FSI ANALYSIS OF THE EFFECT OF STACKED CHIP WITH TSV'S IN ENCAPSULATION PROCESS OF 3D IC INTEGRATION PACKAGE" (01.09.2011 - 31.08.2013) (Principal)
[ INTEL TECHNOLOGY SDN. BHD. ] - Source: eR&I
7 FUNDAMENTAL RESEARCH GRANT SCHEME (FRGS), "FLUID/ STRUCTURE INTERACTION AND THERMAL ANALYSIS DURING REFLOW SOLDERING PROCESS" (01.08.2011 - 31.07.2013) (Principal)
[ KEMENTERIAN PENGAJIAN TINGGI ] - Source: eR&I
8 EXTERNAL AGENCY (INDUSTRY/PRIVATE), "STUDY OF FLUID/SOLID INTERACTION OF EPOXY FLOW DURING STAKED-CHIP ENCAPSULATION PROCESS" (01.09.2009 - 31.08.2011) (Principal)
[ INTEL TECHNOLOGY SDN. BHD. ] - Source: eR&I
9 IRPA, "DESIGN, CONSTRUCTION AND TESTING OF ULTRA-LOW NOX, CO AND UBC POROUS BURNER" (01.08.2005 - 31.01.2008) (Principal)
[ IRPA RMK8 KATEGORI EA ] - Source: eR&I
10 IRPA, "STUDY ON THERMAL CONTRACT RESISTANCE FOR HEAT DISSIPATION IN ELECTRONIC COMPONENTS AND SYSTEMS." (01.11.2003 - 31.10.2006) (Principal)
[ RM8 ] - Source: eR&I
11 FUNDAMENTAL RESEARCH GRANT SCHEME (FRGS), "KAJIAN PERBANDINGAN PRESTASI AERODINAMIK BAGI BEBERAPA JENIS BURUNG TEMPATAN" (01.10.2003 - 30.09.2005) (Principal)
[ FRGS ] - Source: eR&I
12 IRPA, "ADVANCED THERMAL MANAGEMENT TECHNIQUES FOR SUSTAINABLE DEVELOPMENT OF MICROELECTRONIC INDUSTRY IN 21ST. CENTURY" (01.01.2003 - 31.12.2005) (Principal)
[ RM8 ] - Source: eR&I
13 IRPA, "DESIGN DEVELOPMENT AND CONSTRUCTION OF REMOTE PILOTED VEHICLES (RPV) FOR CIVIL SECTOR" (01.10.1999 - 30.09.2001) (Principal)
[ RM7 ] - Source: eR&I