CV Information
PROFESOR IR. DR. TAKSIAH BINTI A. MAJID
| |
---|---|
Grant's Name,"Project's Title" (Research Period)(Role)[Sponsorship]
| |
1 | RESEARCH UNIVERSITY (INDIVIDUAL), "DEVELOPMENT OF CONNECTION SYSTEM AT THE OVERHANG ROOF OF RURAL HOUSES SUBJECTED TO HIGH WIND FORCE" (01.05.2018 - 30.04.2021) (Principal) [ USM (RU) ] - Source: eR&I |
2 | RESEARCH UNIVERSITY (INDIVIDUAL), "STUDY ON THE BEHAVIOUR OF FLEXURAL CRACK GROWTH OF STEEL FIBER REINFORCED CONCRETE ASSOCIATED WITH AE TECHNIQUE" (01.12.2013 - 30.11.2016) (Principal) [ USM (RU) ] - Source: eR&I |
3 | DELIVERING EXCELLENCE GRANT, "THE EFFECT OF WIND LOAD ON RURAL ROOFING SYSTEM" (01.11.2012 - 31.10.2014) (Principal) [ APEX ] - Source: eR&I |
4 | RESEARCH UNIVERSITY (INDIVIDUAL), "DUCTILITY DEMANDS OF INELASTIC STRUCTURES AFFECTED BY REPEATED EARTHQUAKES" (01.01.2011 - 31.12.2013) (Principal) [ USM (RU) ] - Source: eR&I |
5 | SHORT TERM - ACADEMIC STAFF, "PROBABILISTIC SEISMIC ASSESSMENT OF REINFORCED CONCRETE BUILDINGS IN SABAH" (01.06.2010 - 31.05.2012) (Principal) [ USM (JANGKA PENDEK) ] - Source: eR&I |
6 | SHORT TERM - ACADEMIC STAFF, "VULNERABILITY OF REINFORCED CONCRETE TALL BUILDING DUE TO SUMATRAN EARTHQUAKES" (15.03.2007 - 14.03.2009) (Principal) [ USM (JANGKA PENDEK) ] - Source: eR&I |
7 | SHORT TERM - ACADEMIC STAFF, "SEISMIC HAZARD ANALYSIS OF THE PULAU PINANG AND KUALA LUMPUR DUE TO SUMATRAN EARTHQUAKES" (01.04.2004 - 31.03.2006) (Principal) [ USM (JANGKA PENDEK) ] - Source: eR&I |
8 | SHORT TERM - ACADEMIC STAFF, "KAJIAN PROFIL ANGIN DI SEBERANG PERAI UNTUK KOD PIAWAIAN BEBAN ANGIN DI MALAYSIA" (01.11.2001 - 31.10.2002) (Principal) [ J/PENDEK ] - Source: eR&I |
9 | SHORT TERM - ACADEMIC STAFF, "KAJIAN KEROSAKAN STRUKTUR MELALUI ANGGARAN PARAMETER DINAMIK." (01.03.1998 - 28.02.2000) (Principal) [ USM (JANGKA PENDEK) ] - Source: eR&I |
10 | , "INSENTIF “GRADUATE ON TIME� (GOT), STUDENT-AKHTAM HATEM QASIM" (01.02.2021 - 31.01.2022) [ USM ] - Source: HCMSv3 |
11 | , "STUDY ON THE BEHAVIOUR OF FLEXURAL CRACK GROWTH OF STEEL FIBER REINFORCED CONCRETE ASSOCIATED WITH AE TECHNIQUE" (01.12.2013 - 31.05.2017) [ USM RU I Grant ] - Source: HCMSv3 |
12 | , "BEKALAN AIR UNTUK MASYARAKAT KURANG MAMPU KG ORANG ASLI KG LANGKOR POS KENANG, SG SIPUT(U), PERAK" (12.09.2011 - 11.09.2012) (06) [ Pengarah Komuniti/Flagship ] - Source: HCMSv3 |