CV Information
MOHD ASHRAF BIN MOHAMAD ISMAIL PROFESOR MADYA IR. DR. MOHD ASHRAF BIN MOHAMAD ISMAIL
Grant's Name,"Project's Title" (Research Period)(Role)[Sponsorship]
1 SHORT TERM - KHAS, "JOINT ROUGHNESS COEFFICIENT ASSESSMENT (JRC) FOR ROCK SLOPE USING IMAGE ANALYSIS TECHNIQUE" (01.11.2022 - 30.04.2024) (Principal)
[ USM (JANGKA PENDEK) ] - Source: eR&I
2 RESEARCH UNIVERSITY (INDIVIDUAL), "THE EVALUATION OF EARLY-HIGH STRENGTH STEEL FIBER REINFORCED SHOTCRETE (SFRS) AND ITS INTERACTION WITH THE SURROUNDING ROCK MASS AS THE PRIMARY TUNNEL SUPPORT IN OVERSTRESSING ROCK" (01.03.2019 - 28.02.2021) (Principal)
[ USM (RU) ] - Source: eR&I
3 BRIDGING GRANT, "CHANGE DETECTION ANALYSIS OF LANDSLIDE DYNAMICS USING CLASSIFICATION AND COMBINED ITERATIVE CLOSEST POINTS (CCICP) ALGORITHM" (15.12.2018 - 14.12.2019) (Principal)
[ UNIVERSITI SAINS MALAYSIA (USM) ] - Source: eR&I
4 RESEARCH UNIVERSITY (INDIVIDUAL), "EVALUATION OF REAL TIME PORE WATER PRESSURE DISTRIBUTION FOR STABILITY ANALYSIS IN UNSATURATED SOIL SLOPES" (01.12.2013 - 30.11.2015) (Principal)
[ USM (RU) ] - Source: eR&I
5 SHORT TERM - ACADEMIC STAFF, "STUDY OF DIFFERENT RAINFALL CHARACTERISTICS ON RAINWATER INFILTRATION MECHANISM INTO SOIL SLOPE USING 2-D SLOPE MODEL AND SEEPAGE FLOW MODEL" (15.11.2013 - 14.11.2015) (Principal)
[ USM (JANGKA PENDEK) ] - Source: eR&I
6 SHORT TERM - ACADEMIC STAFF, "EFFECT OF PIPE ROOFING SUPPORTS ON THE GROUND SETTLEMENT INDUCED BY SHALLOW TUNNEL EXCAVATION" (15.08.2011 - 14.08.2013) (Principal)
[ USM (JANGKA PENDEK) ] - Source: eR&I
7 , "DEVELOPMENT OF THE PRACTICAL FRACTURE SEALING SYSTEM FOR THE PREDICTION AND DESIGN OF GROUTING OPERATION" (30.12.2010 - 29.12.2011) (Principal)
[ USM (INSENTIF) ] - Source: eR&I